[China Glass Net] How to operate the whole shower room installation process? In fact, the glass used in the shower room is usually tempered glass processed by physical methods. After the glass is heated to a certain temperature, it is suddenly cooled, and the tempered glass changes. The crystal structure of the glass part improves the surface hardness, the impact resistance of the glass, and the bending strength is more than ten times higher than that of ordinary glass. Solid Color Fabric,Solid Colour Cotton Fabric,Solid Color Cotton Fabric,Solid Color Fabric By The Yard shaoxing rongxi textile co.,ltd , https://www.rongxifabric.com
The whole shower room installation process: process one
Preparation and bottom basin installation, the bottom basin installation must be careful, testing water testing is an essential part, to see if the product packaging is complete, check whether its configuration is complete after opening. Prepare the necessary tools and put them together for easy access. Next, prepare the bottom basin, combine the bottom parts, adjust the level of the bottom basin, and ensure that there is no water in the basin or the bottom of the basin. The hose can be telescoped with distance. When the bottom of the basin is connected with the floor drain, it needs to be tested for water to ensure unimpeded water flow. The installed bottom basin should also be protected in time before the installation of the house.
The whole shower room installation process: process two
Clear the condition of the bathroom pipe to prevent the concealed pipeline from being blown when punching. Use a pencil and a level to determine the drilling position of the aluminum against the wall and punch the hole with a hammer drill. Whether the shower room is safe or not has an important relationship with whether the room is installed properly. Whether the hole is accurate, whether the fitting is tight or not, and whether the waterproof seal is good or not affects the normal use of the product. Knock on the rubber in the hole and lock the aluminum bar to the wall with screws. Note that it is necessary to adjust continuously while installing to maintain the verticality of the aluminum.
The whole shower room installation process: process three
When fixing the glass, lock the glass to the hole of the bottom basin, and drop the bottom of the flat glass or curved glass into the glass clip groove, and slowly push it into the wall aluminum. Fix it with screws. After fixing the glass, find the corresponding position above the fixed glass, install the (straight/oblique) fixing seat and connect the top tube. Secure it to the top of the glass with a bent sleeve. Align the position of the device rack, tighten the plate nut, and fix the laminate glass to maintain vertical and horizontal. Be careful to waterproof under the fixed glass of aluminum. Install the hardware of the movable door and install the hinges at the reserved holes of the fixed door. After the installation, adjust the position of the shaft core of the lotus leaf, and it is better to close the door.
Overall shower room installation process four: process four
Install the suction strip or the water retaining strip on the side or below the glass as required. Use aluminum mesh to seal the seam between the aluminum and the wall, glass and bottom basin. Check that all parts are comfortable and smooth, and find problems in time. After adjusting, tighten the corresponding screws to make the whole shower room firmer. Wipe the entire shower room with a rag.